The pre-production sample—often called a PP sample—is the final physical reference a factory uses before bulk cutting begins. It should represent the approved fabric, colour, trims, fit, construction, labels and packaging direction. If it is not reviewed carefully, the same issue can be repeated hundreds or thousands of times in bulk production.
Use this pre-production sample checklist to make the approval decision deliberate, documented and easy for the factory to follow.
A pre-production sample is a garment made after development and fit decisions are complete, using the intended bulk materials and final production methods wherever possible. It is different from an early proto sample, which is mainly used to test the design and silhouette.
The PP sample answers one question: if bulk production matches this sample, is the brand ready to accept it?
If the answer is no, document the correction before bulk cutting starts.
Do not review a PP sample from memory. Open the current tech pack version and make sure the sample is being compared against the same approved document the factory received.
Confirm:
If the factory is working from an old version, pause the approval. A visually good sample can still be wrong if it reflects outdated measurements, trims or artwork.
Record actual measurements beside the approved spec. A sample that is within tolerance may pass numerically but still require a fit comment; document both facts.
Take photos of details that need a correction. Number the comments so the factory can map each one to a specific location.
Small trim substitutions can change quality perception quickly. Compare every visible component to the BOM rather than assuming it is correct.
Use a simple, explicit outcome so the factory knows whether it can proceed.
| Status | Meaning | Factory action |
|---|---|---|
| Approved | Sample matches the approved requirements | Proceed with bulk according to the approved tech pack |
| Approved with comments | Minor changes are accepted but must be implemented | Confirm comments in writing before bulk |
| Revise and resubmit | Material, fit or construction issue needs another sample | Do not start bulk cutting |
| On hold | Information or approval is missing | Pause the affected production step |
Avoid using only “looks good” in an email. Approval should name the style, colourway, size, version and status.
Good sample comments include the observed result, the tech pack reference and the required action.
Comment 4: Left chest pocket is 1.5 cm too low. Tech pack v2.0, flat sketch callout C shows the pocket top edge 8 cm below shoulder seam. Raise pocket 1.5 cm for PP recheck and bulk.
This is more useful than “pocket looks low,” because it gives the sample room an exact target and a source reference.
The final PP sample approval should be stored with the tech pack, BOM, measurement spec and sample comments. It becomes the reference for production, quality control and any later factory conversation.
ThreadPack helps keep those documents and revisions connected to the same style, so the latest approved instruction is easier to find than a scattered email thread.
Use this checklist alongside how to communicate with garment factories using a tech pack and the complete tech pack guide.
FAQ
It should not start bulk cutting without a documented approval or an explicitly agreed commercial exception. Changes after cutting are significantly more expensive.
It should be whenever possible. If final bulk fabric is unavailable, clearly record what differs and what must be reconfirmed before production.
The person responsible for technical product decisions should approve it, with input from design, production and quality where needed. The approval should be recorded in writing.